Home | News | Tech References | Products| PowerPoint Presentation  

P R E S S  R E L E A S E - October 25, 2002 

Bronx, NY (October 25, 2002) -- EASCO Boiler Corporation is pleased to announce an partnership that will allow them to now produce quality high pressure boilers on the job site. Partnering with a company who has the ability to do on-site post- weld heat treatment now expands the scope of boilers now available through EASCO’s famous field-erect methods.

Long-known for their ability to site-build quality Section IV low pressure steam and hot water boilers quickly and cost-effectively, the availability of on-site stress relief technology will expand the company’s abilities to include boilers that comply with Section I of the ASME Boiler and Pressure Vessel Code as well. Costing for this new option will be job specific based on egress, distance and time frame.  The process will take place from 9 national locations to provide convenient access to projects across the United States.  The process will add only 3-5 days to project completion.

In the past year EASCO has greatly expanded on their boiler product line.  In addition to their well-know field-erected and packaged low pressure (20 -1000 BHP) scotch and firebox boilers, EASCO has introduced their SM5 “Thru-the Door” boiler (20 - 150 BHP) as well a the SM1 Series high pressure scotch-design packaged boilers (30-1500 BHP). New literature for the Series SM5 has just recently been released and is attached to this announcement.

With the addition of high pressure field-erect boiler capabilities, EASCO now holds a unique position in the market place as the only company in the industry truly able to provide boilers whenever and wherever they are needed.

EASCO Boiler Corp.
1175 Leggett Avenue
Bronx, NY 10474 USA

Ph: 718-378-3000
Fax: 718-378-4560
E-mail: webmaster@easco.com

Copyright © 1997 EASCO Boiler Corp. All Rights Reserved.
This material may not be reproduced in any form without permission.